200A panel upgrades
Panel replacement and capacity planning for new equipment, remodeling or an addition.
An addition, commercial renovation or new electrical equipment can change how much power a property needs. SoCal Power Co. evaluates service upgrade projects that may extend beyond replacing the breaker panel.
California C-10 Electrical Contractor · Verify CSLB #1144691
A panel distributes electricity to circuits. An electrical service upgrade considers the supply feeding that panel and may involve meter equipment, service conductors, grounding and the utility connection. The required work depends on existing conditions and the capacity supported by the utility. A larger panel label alone does not establish available supply.
Tell us about an addition, remodel, tenant improvement, EV charging or other equipment together. Reviewing the full plan helps avoid choosing equipment around only one part of the project. We assess the proposed demand and discuss whether service changes are necessary or whether a more limited electrical scope may be appropriate.
Plan a commercial or new construction project

Utility review, local permits and inspections can affect equipment selection, location and scheduling. Access, overhead or underground service arrangements and other property conditions may also affect the scope. The estimate should clarify the contractor’s work and any utility, permit, trenching or restoration responsibilities that need separate coordination.
Service changes can involve a planned interruption and dependencies outside the electrical contractor’s control. Discuss utility requirements and essential-power needs early. We do not promise a standard completion date or that every property can support a particular service size. Request an assessment before purchasing major equipment or scheduling dependent work.
There can be overlap, but a service upgrade concerns the supply and associated equipment. A panel replacement may not change that supply. The assessment determines which scope applies.
Yes, depending on the existing supply and proposed capacity. The utility determines its requirements; these need to be considered before final equipment and scheduling decisions.
Your city, property type, planned new equipment and any existing plans or utility correspondence. Mention that documents are available; do not paste account numbers or sensitive documents into the form.
Panel replacement and capacity planning for new equipment, remodeling or an addition.
Plan Level 2 home charging around the charger, parking location and existing electrical capacity.
Lighting, outlets, dedicated circuits, whole-house rewiring and electrical work for remodels or additions.
We regularly serve customers within approximately 40–50 miles of La Puente, including La Puente, West Covina, El Monte, Hacienda Heights and surrounding communities. Outside that area? Contact us for a custom estimate. Additional travel charges may apply depending on distance and project scope.
Explore our service area and local planning resources
Scheduled service only. We do not offer emergency or after-hours service.
Tell us about your project and city. We will review your request and contact you to discuss the scope, availability and next steps. An inquiry does not book an appointment.
Scheduled electrical services only. We do not offer emergency or after-hours service.
Phone: (626) 391‑6944
Email: [email protected]
Allow Google Analytics cookies to measure visits, call clicks and accepted estimate requests? Your form details are excluded. Calls and forms work either way.
Google receives page, device and broad service/source information. We exclude names, phones, emails and project details. Your choice is remembered for up to six months; Analytics cookies last up to 60 days. Change or withdraw permission using “Analytics choices” in the footer.
This choice applies to Analytics only; existing Google Ads measurement is separate. Browser Global Privacy Control and Do Not Track signals keep Analytics off.
Google privacy policy. Contact [email protected] about privacy.